Site Agent
Posted 01/10/2024 by JNBentley
- Location:
- Cambridge (34 miles)
- Job Type:
- Permanent
A shaft to intercept wastewater at the existing WWTP and a tunnel/ pipeline with major crossings to transfer it to the new WWTP. Temporary intermediate shafts to launch and recover the micro-tunnel boring machine. A gravity pipeline transferring treated wastewater to a discharge point on … more